Make, Assemble and Build to Order Without Losing Track of Stock with Manufacturing Inventory Software

The Problem Starts When Components Become Something Else

You know how many components you bought and you know how many finished products you sold. It is what happened between the two that often ends up on a production sheet, a spreadsheet or in somebody’s head.

You might make standard products for stock all week, assemble something only after the customer orders it, and have a bespoke engineering job running alongside both.

Turbo records what production used and what it made, so the stock figure survives the transformation.

Manufacturing Software From Materials to Finished Stock

Bill of Materials (BOM) Software
Define What Goes Into the Finished Product

Set the components and quantities needed to make a repeatable product.
The Bill of Materials uses the same products you already purchase and hold in stock, so the materials production needs are already part of your inventory.

Manufacturing Material Availability
Inventory management and delivery process illustration
How Many Can We Make With What’s on the Shelf?

Before starting production, see how many finished units the components already in stock will support.
Turbo checks the material requirement against available inventory.

Manufacturing Order Software
Checklist and truck with service report icons.
Make for Stock or in Response to an Order

Raise a manufacturing order because finished stock is running low, or because a customer has ordered something that needs to be made or assembled.
The same manufacturing workflow can support replenishing stock, making against a customer order or assembling known components after the order arrives — the make-to-stock, make-to-order and assemble-to-order models used by different manufacturers.

Record Production
Asset management checklist with trucks and progress bars.
Record What Actually Came Off the Floor

A planned run and a completed run are not always the same thing.
Record the quantity actually produced and the materials used to make it. If the run finishes short of plan, record the real output rather than completing the quantity that was originally expected.

Batch & Heat Traceability Software
Logistics planning checklist and calendar graphic
If a Material Batch Is Recalled, Know What You Made With It

If a raw-material batch or heat number is used in production, keep that identity through the manufacturing record so you can trace which finished stock consumed it.
When a supplier tells you a batch has a problem, you have somewhere to start.

Engineer-to-Order & Project Manufacturing
When the Job Is Different Every Time

Some work does not begin with a standard finished product and fixed BOM.
For bespoke or engineer-to-order jobs, Turbo Projects can keep design or engineering time, bought-in items, custom lines and materials used against the customer job alongside the billing.

Manufacturing Costing
Cost the Output From the Materials Used

Production records the material consumed, giving the finished stock a cost grounded in the inventory used to make it.
Where batch and weighted-average costing apply, those stock costs remain part of the calculation rather than manufacturing relying on a separate figure maintained elsewhere.

Manufacturing Batch & Pallet Labels
Put the Production Identity on the Pallet

Generate labels for manufactured batches so the finished stock carries its production identity into the warehouse.
It sounds like a small detail until somebody is standing beside a pallet trying to work out which production batch it belongs to.

Define What Goes Into the Finished Product

Set the components and quantities needed to make a repeatable product.
The Bill of Materials uses the same products you already purchase and hold in stock, so the materials production needs are already part of your inventory.

Inventory management and delivery process illustration
How Many Can We Make With What’s on the Shelf?

Before starting production, see how many finished units the components already in stock will support.
Turbo checks the material requirement against available inventory.

Checklist and truck with service report icons.
Make for Stock or in Response to an Order

Raise a manufacturing order because finished stock is running low, or because a customer has ordered something that needs to be made or assembled.
The same manufacturing workflow can support replenishing stock, making against a customer order or assembling known components after the order arrives — the make-to-stock, make-to-order and assemble-to-order models used by different manufacturers.

Asset management checklist with trucks and progress bars.
Record What Actually Came Off the Floor

A planned run and a completed run are not always the same thing.
Record the quantity actually produced and the materials used to make it. If the run finishes short of plan, record the real output rather than completing the quantity that was originally expected.

Logistics planning checklist and calendar graphic
If a Material Batch Is Recalled, Know What You Made With It

If a raw-material batch or heat number is used in production, keep that identity through the manufacturing record so you can trace which finished stock consumed it.
When a supplier tells you a batch has a problem, you have somewhere to start.

When the Job Is Different Every Time

Some work does not begin with a standard finished product and fixed BOM.
For bespoke or engineer-to-order jobs, Turbo Projects can keep design or engineering time, bought-in items, custom lines and materials used against the customer job alongside the billing.

Cost the Output From the Materials Used

Production records the material consumed, giving the finished stock a cost grounded in the inventory used to make it.
Where batch and weighted-average costing apply, those stock costs remain part of the calculation rather than manufacturing relying on a separate figure maintained elsewhere.

Put the Production Identity on the Pallet

Generate labels for manufactured batches so the finished stock carries its production identity into the warehouse.
It sounds like a small detail until somebody is standing beside a pallet trying to work out which production batch it belongs to.

Turbo is particularly well suited where production sits alongside purchasing, warehousing, sales, projects or service rather than operating as a world of its own.

1.
Make-to-Stock Manufacturers
Use Bills of Materials and Manufacturing Orders to turn stocked components into repeatable finished products.
2.
Make-to-Order & Assembly Businesses
Make or assemble when customer demand arrives while keeping the components and finished product in the same stock system.
3.
Engineering & Bespoke Manufacturers
Use project-based workflows where a customer job brings together engineering time, custom materials, purchasing and billing.
4.
Distributors & Merchants That Also Manufacture
Buy and sell ordinary stock while also assembling, kitting or manufacturing some of the products you supply.
Book a Demo

First Name(Required)
Last Name(Required)
Country
Book a Demo
Manufacturing Software FAQs
Is Turbo light manufacturing software?

Turbo covers many of the workflows businesses associate with light manufacturing software, including Bills of Materials, manufacturing orders, make-to-stock and make-to-order production, assembly, material consumption, costing and batch traceability. It also extends into bespoke and project-based manufacturing where the job does not fit a standard production run.

Is Turbo MRP software?

Turbo includes manufacturing and inventory capabilities used in material planning and production, but it is not positioned as a full specialist MRP suite for every manufacturing environment. It is particularly suited to SMEs that need manufacturing to work alongside purchasing, stock, projects, sales, delivery and service.

Published: 16/07/2026
Everything Inventory, One System
Most inventory systems promise to help you keep track of stock. The reality is…
Published: 12/06/2026
Request for Quote (RFQ) Software: Why Modern Businesses Should Stop Using Purchase Orders for Supplier Quotations
What Is a Request for Quote (RFQ)? A Request for Quote (RFQ) is a…
Published: 11/06/2026
Discussing-inventory-management-solutions-for-hardware-businesses
The Goldilocks Solution: Hitting the Hardware Trade’s Inventory Sweet Spot
The Goldilocks Solution: Hitting the hardware trade’s inventory sweet spot
Published: 18/05/2026
Why Weighted Average Costing Matters in Modern Inventory Management
That’s why we’re excited to introduce Weighted Average Costing (WAC) in Turbo Inventory.
Published: 14/04/2026
Why Practice Accountants Should Care About Inventory Management 
And why it can become a valuable advisory and partner opportunity  If your…
Published: 14/05/2026
Inventory Software Partner Opportunity for System Integrators
System integrators, ERP consultants, and inventory software implementation partners are increasingly being asked to…
Published: 19/11/2025
Pricing products by the ML\Bottle\Half Bottle etc
For our Veterinary users Turbo Inventory (this covers Small Animal Practices, Large Animal Practices, Equine and…
Published: 19/11/2025
Why write Discharge Instructions
When veterinary clients don’t follow your instructions, their pets suffer. Use these steps to…
Published: 18/11/2025
How Sage compares to Big Red Cloud and Turbo Inventory
Investigating in accounting and inventory software for your product business? See how Sage compares…
Published: 19/11/2025
Xero has Shut Down LOCATE Inventory, What Now?
We’re stepping up to help businesses impacted. On November 10th, Xero…